watch now

More articles about: Pasig River Expressway

“We are sensitive to public opinion,” Ramon Ang said.
San Miguel Corp. will no longer pursue plans to build the multi-billion Pasig River Expressway (Parex). In a press conference, SMC president Ramon Ang said the company has decided to pull the plug on the project after stiff opposition from different ...
Architect Paulo Alcazaren shows the locations of the heritage sites.
Buildings and structures that are at least 50 years old are automatically considered "Important Cultural Property," according to the National Cultural Heritage Act of 2009. A number of such structures, including buildings, bridges, and houses are located very close to the proposed ...
Parex is a go.
The Department of Transportation (DOTr) and the Department of Public Works and Highways (DPWH) has formalized its partnership with San Miguel Corp. (SMC) for the construction of the P81.53-billion Pasig River Expressway (Parex) on Tuesday (September 21. SMC signed a ...
Target completion date: 2023.
San Miguel Corporation has confirmed that it will next tackle an ambitious project to connect the eastern and western portions of Metro Manila via the Pasig River Expressway Project (PAREX). In a disclosure to the Philippine Stock Exchange to confirm an earlier ...
Load More Articles
Connect With Us
Close
Read Cover Story
Catfish Image